Reports tied to this Journal
Breeding Journal, Species: Hemiscyllium ocellatum
Tuesday, January 1, 2013 8:26 PM
( permalink)
Breeding Journal DataSheet This first post should be updated regularly to include new information as events take place or changes are made to your system General Species: Hemiscyllium ocellatum Social Structure: Pair Size of Individuals: Male: 38in Female: 30 in Age of Individuals: Unknown Date added to Tank: Female September 2011, Male: November 2012 Broodstock Tank Details Size of Tank: 2,300 Gal Substrate Details: shallow sand bed Filtration Details: sand filter Water Changes: 25% monthly Water Temperature: 76 F Lighting: fluorescent shop lights Lighting Cycle: 12 hr Other Tank Inhabitants: Regal Tang, batfish, cortez ray Broodstock Feeding Details Food Types: frozen: shrimp, krill, silversides Feeding Schedule: Mon, Wed, Fri Spawning Details Date of First Spawn: 12/7/12 Spawn Time of Day: late night Dates of Consecutive Spawns: 12/21/12 Courtship Details: First, the male grabs the females pectoral fin, and drags the the female around. The male then flips the female over, inserting a single clasper. See attached video Egg Size: approx 3 in Egg Color: dark green Egg Count: 1 Hatch Details Hatch Date: Hatch Time of Day: # Days after Spawn: Larvae Description: Consecutive Hatch Dates: Larval Tank Details Temperature: Size of Larval Tank: Substrate Details: Other Tank Decor: Filtration Details: Lighting: Lighting Cycle: Water Changes: Larval Feeding Details Food Types: Feeding Schedule: Metamorphosis/Settlement Date of Settlement Start: Days after Hatch: Date of Settlement End: Description of Fry: Grow-Out Tank Details Temperature: Size of Grow-Out Tank: Substrate Details: Other Tank Decor: Filtration Details: Lighting: Lighting Cycle: Water Changes: Size at Transfer: Age at Transfer: Grow-Out Feeding Details Food Types: Feeding Schedule: Additional Information (No Pictures or Videos in the Section Please) Miscellaneous Information: You will be required to provide photographic or video evidence in this thread of each event submitted for the MBI Program. If your thread does not contain these photos the MBI Committee will not be able to approve your reports. PHOTOS AND VIDEO S MUST BE PLACED IN ADDITIONAL POSTS, NEVER IN THE FIRST POST IN A JOURNAL.
|
|