Breeding Journal DataSheet
This first post should be updated regularly to include new information as events take place or changes are made to your system
General Species: Centropyge argi
Social Structure: Harem (trio for me)
Size of Individuals: ~2 inch male, ~1.5 inch female, ~1 inch female
Age of Individuals: Unknown, wild caught
Date added to Tank: 4-26-2014 (but were kept together in quarantine before that)
Broodstock Tank Details Size of Tank: 20 gallon high
Substrate Details: None
Filtration Details: Bioballs, protein skimmer, macro algae, live rock
Water Changes: As needed
Water Temperature: ~80 F
Lighting: Fluorescent strip light (ambient) and CFL
Lighting Cycle: 6AM to 9PM
Other Tank Inhabitants: None
Broodstock Feeding Details Food Types: Mysis, enriched artemia, live artemia (usually bbs), frozen mash, pellet, live blackworms
Feeding Schedule: At least 2 times a day
Spawning Details Date of First Spawn: 5-4-2014 (First that I noticed/checked for)
Spawn Time of Day: Evening, around lights out
Dates of Consecutive Spawns: 5-5-2014, 5-7-2014
Courtship Details: Not witnessed
Egg Size: ~500uM
Egg Color: Clear
Egg Count: Less than 50
Hatch Details Hatch Date: 5-5-2014
Hatch Time of Day: Mid day to early evening (uncertain since I was not home to check frequently)
# Days after Spawn: Less than 24 hours
Larvae Description: Prolarvae, clear, large yolk sac, oil globule
Consecutive Hatch Dates: Larval Tank Details Temperature: 80F
Size of Larval Tank: Currently in a specimen cup
Substrate Details: None
Other Tank Decor: None
Filtration Details: None
Lighting: Fluorescent strip light
Lighting Cycle: 6AM to 9PM
Water Changes: Larval Feeding Details Food Types: Feeding Schedule: Metamorphosis/Settlement Date of Settlement Start: Days after Hatch: Date of Settlement End: Description of Fry:
Grow-Out Tank Details Temperature: Size of Grow-Out Tank: Substrate Details: Other Tank Decor: Filtration Details: Lighting: Lighting Cycle: Water Changes: Size at Transfer: Age at Transfer: Grow-Out Feeding Details Food Types: Feeding Schedule: Additional Information (No Pictures or Videos in the Section Please) Miscellaneous Information: You will be required to provide photographic or video evidence in this thread of each event submitted for the MBI Program.
If your thread does not contain these photos the MBI Committee will not be able to approve your reports. PHOTOS AND VIDEO S MUST BE PLACED IN ADDITIONAL POSTS, NEVER IN THE FIRST POST IN A JOURNAL.
<message edited by shannpeach on Thursday, May 8, 2014 8:20 AM>